Toll Free No
+
18001800525
Member Login
Forgot Password?
You are the Visitor No.
hit counter
 
 District  Category  Tender Title.  Tender Date Order By
   
 
 
DistrictCategoryTender NoTender DateTender TitleLast Date Of SaleOpening Date 
MAU 2016-17 4th Qtr (Jan-17-Mar-17) 56 12/01/2017 Corrigendum notice no. 2158/M-24/372 dated 24.12.16 27/03/2017 30/03/2017 corr 56 02 12.01.17.pdf
MAU 2016-17 4th Qtr (Jan-17-Mar-17) 57 12/01/2017 Corrigendum notice no. 2161/M-24/375 dt. 24-12-2016 27/03/2017 30/03/2017 corr 57 03 12.01.17.pdf
Ghaziabad 2016-17 3rd Qtr (Oct-16 to Dec-16) 1611 14/12/2016 Construction of RCC in OHT & etc. 25/03/2017 28/03/2017 tender 1611 99 14.12.16.pdf
Ghazipur 2016-17 3rd Qtr (Oct-16 to Dec-16) 1612 14/12/2016 Pipe Payjal project & etc. 20/03/2017 28/03/2017 tender 1612 100 14.12.16.pdf
Ghaziabad 2016-17 4th Qtr (Jan-17-Mar-17) 35 04/01/2017 Corrigendum notice no. 2192/vividh-13/204 dated 05.12.16 22/03/2017 23/03/2017 corr 35 15 04.01.17.pdf
Ghaziabad 2016-17 4th Qtr (Jan-17-Mar-17) 34 04/01/2017 Corrigendum notice no. 2133/vividh-13/197 dated 28.11.16 22/03/2017 23/03/2017 corr 34 14 04.01.17.pdf
Varanasi 2016-17 3rd Qtr (Oct-16 to Dec-16) 5172 30/12/2016 Sewerage treatment plant & etc. 25/01/2017 03/03/2017 Final NIT.pdf
Varanasi 2016-17 4th Qtr (Jan-17-Mar-17) 167 11/01/2017 Corrigendum notice no. 5172/08-081-005/122 dated 30.12.16 25/01/2017 03/03/2017 Addendum No.-1 dt. 11.01.2017 for Raman STP.pdf
Varanasi 2016-17 3rd Qtr (Oct-16 to Dec-16) 3576 26/12/2016 Construction of RCC in OHT & etc. 21/02/2017 23/02/2017 tender 3576 26 26.12.160001.pdf
Kanpur Nagar 2016-17 3rd Qtr (Oct-16 to Dec-16) 2583 16/12/2016 Survey, review the designs, redesign where necessary and build new sewerage network of about 102 km length and rehabilitation of existing small sized sewer and trunk sewer network of 300 km length including survey, design, & construction of 4 no. Of 10/02/2017 14/02/2017 Chacha nehru sps Layout.pdf
Gandhi Park sps Layout.pdf
Maqdoom shah baba sps Layout.pdf
Patkapur LS Layout 1.pdf
Patkapur LS Layout 2.pdf
sanjaypuram sps Layout.pdf
shiwaan tannery LS Layout.pdf
Corrected BD 20-12-2016-vol 1(commented)_new.pdf
Dist-1 all zones.pdf
ZONE 1 Sewerage Network (1-20).pdf
ZONE 2 Sewerage Network(1-9).pdf
ZONE 1 Sewerage Network (21-25).pdf
ZONE 3 Sewerage Network (1-20).pdf
CHACHA NEHRU SPS DESIGN.pdf
GANDHI PARK DESIGN.pdf
MAQDOOM SHAH BAB SPS DESIGN.pdf
PATKAPUR LS DESIGN.pdf
SANJAYPURAM SPS DESIGN.pdf
SIWAAN TANNERY LS DESIGN.pdf
IFB - Kanpur Sewerage Dist.-1.pdf
ZONE 3 Sewerage Network (21-24).pdf
ZONE 4 Sewerage Network (1-20).pdf
ZONE 4 Sewerage Network (21-27).pdf
ZONE 5 Sewerage Network (1-3).pdf
EXHIBIT-1.pdf
EXHIBIT-2.pdf
EXHIBIT-3.pdf
EXHIBIT-4.pdf
Exhibit-5.pdf
Banda 2016-17 3rd Qtr (Oct-16 to Dec-16) 8442 29/12/2016 Drilling and development of 3 Nos. of tubewells, Supply & Installation of Chlorinting Plant, installation of pumping plant electricification of Pump House, Supply & installation of voltage stabilizer 27/01/2017 03/02/2017 tender 8442 358 29.12.16.pdf
Banda 2016-17 3rd Qtr (Oct-16 to Dec-16) 8441 29/01/2017 Drilling and development of 3 Nos. of tubewells, Supply & Installation of Chlorinting Plant, installation of pumping plant electricification of Pump House, Supply & installation of voltage stabilizer 27/01/2017 03/02/2017 tender 8441 357 29.12.16.pdf
Jhansi 2016-17 4th Qtr (Jan-17-Mar-17) 45 09/01/2017 Corrigendum notice no. 2527/M-3/703 dt. 28-12-2016 19/01/2017 31/01/2017 corr 45 21 09.01.17.pdf
Jhansi 2016-17 3rd Qtr (Oct-16 to Dec-16) 2527 28/12/2016 MADAURA KHURD VILLAGE WATER SUPPLY SCHEME BLOCK MOTH DISTT. JHANSI 19/01/2017 31/01/2017 tender 2527 709 28.12.16.pdf
Sitapur 2016-17 4th Qtr (Jan-17-Mar-17) 84 13/01/2017 Corrigendum notice no. 2049/M-10/339 dt. 21-12-2016 28/01/2017 31/01/2017 corr 84 02 13.01.17.pdf
Sitapur 2016-17 3rd Qtr (Oct-16 to Dec-16) 2049 21/12/2016 Construction of OHT & etc. 28/01/2017 31/01/2017 tender 2049 339 21.12.16.pdf
Sitapur 2016-17 3rd Qtr (Oct-16 to Dec-16) 2066 24/12/2016 Construction of OHT & etc. 28/01/2017 31/01/2017 tender 2066 342 24.12.16.pdf
Lucknow 2016-17 3rd Qtr (Oct-16 to Dec-16) 1017 28/12/2016 Construction of 2 Nos tubewell of 300x150 mm dia Tube Well Assembly size (154 M deep) by R.C. Rig machine including development by Air compressor and O.P. Unit complete in all respect Nagar Palika Parishad 27/01/2017 30/01/2017 tender 1017 89 28.12.16.pdf
Varanasi 2016-17 3rd Qtr (Oct-16 to Dec-16) 996 24/12/2016 Supply and Laying of 5.448 km length new parallel feeder main from size 1200 mm / 1000 mm dia. by Micro tunnelling method upto 10 m to 12.00 m depth along the existing feeder main of size 1200 mm /1000 mm dia. from Bhelupur water work to Chauka Ghat 17/01/2017 29/01/2017 tender 996 08 24.12.16.pdf
Ghaziabad 2016-17 3rd Qtr (Oct-16 to Dec-16) 2321 26/12/2016 Corrigendum notice no. 2230/ fofo/k&13/218 dated 13/12/2016 17/01/2017 28/01/2017 corr 2321 236 26.12.16.pdf
12345678910...
 
 
Powered by UPDESCO and its Associate M/S MARG Software Solutions.