Under
the Ganga Action Plan
Phase-I at Varanasi, 3
sewage treatment plants
were constructed with
total installed capacity
of 101.80 mld.. However,
the present waste water
flow generated in the
town is about 309 mld.
Hence, it is necessary
to implement further I&D
and treatment works which
have been taken up under
GAP (Phase-II). The Hon'ble
High Court, Allahabad
too has given directions
to make fool-proof arrangements
for abatement of pollution
of river Ganga at the
holy cities of Varanasi
and Allahabad.
The Present approved C.C.E.A.
cost for Varanasi is Rs.
47.52 Crores. 4 schemes
including a scheme for
37 mld STP, costing Rs.
43.92 Crore have been
approved by Govt. of India
against available approved
C.C.E.A. cost which are
under construction.
GANGA
ACTION PLAN (PHASE-II)
AT ALLAHABAD
Allahabad is situated
at the confluence of river
Ganga and Yamuna. The
GAP (Phase-I) covered
interception and diversion
of a total of 90 mld of
waste water, out of which
87 mld was diverted from
Yamuna segment and 3 mld
from Ganga segment. A
60 mld STP was constructed
at Naini. However, at
present about 210 mld
waste water is flowing
in the drains joining
river Ganga and Yamuna
. Therefore, after the
diversion of 90 mld..
in phase-I, 120 mld of
waste water still remains
to be intercepted and
diverted as well as sewage
treatment capacity too
has to be enhanced by
augmenting the existing
STP as also by constructing
new STPs. The present
approved C.C.E.A. cost
for Allahabad is Rs. 34.49
Crores against which a
scheme for interception
and diversion of a drain
and a scheme for 29 mld
capacity STP have been
approved by GOI.
JAPAN
GOVT. ASSISTED (JBIC)
PROGRAM FOR 4 MAJOR CITIES
For the additional works
(in addition to sanctioned
projects) required for
the year 2030 at Lucknow,
Allahabad, Kanpur and
Varanasi, financial assistance
has been sought from Japan
Bank of International
Cooperation (JBIC). Under
this, Japan International
Cooperation Agency (JICA)
has finalized feasibility
reports for above 4 towns
in co-operation with U
P Jal Nigam, Jal Sansthans
and Nagar Nigams. As per
these reports, the cost
of works required for
the year 2015 is given
below : (In Rs. Crore)
Lucknow
: 372.48
Allahabad
: 304.32
Kanpur
: 422.28
Varanasi
: 483.18
Varanasi town has been
given priority by GOI
and a bi-lateral agreement
has been signed between
Govt. of India and JBIC
for schemes for Varanasi
towns, against which DPRs
are being prepared by Jal
Nigam and the works are
expected to start soon.
|